STATUS REPORT, MAY 2004
North Indian River Inlet Marina
Complex
Delaware Seashore State Park
State Managed Rehabilitation and Modernization
Plan
Status Report
May 2004
Prepared by: W. Britt Murray
Chief, Office of Design & Development
Division of Parks and Recreation
August 24, 2004

2003 Aerial Photo (Prior to Phase I Renovation)
MEDIUM (218 KB)
LARGE (2.0 MB)
1970: Indian River Marina/Burtons Island
purchased by State
1980-81: First major renovation (anticipated
lifespan; 15 years)
1988: Added charter docks and additional
recreational slips

In 1996 the Division
of Parks contracted with
Applied Technology
& Management (ATM) to conduct an
engineering study and develop recommendations for reconstruction
1996: Engineering study/recommended
reconstruction plan completed
1996,97,98,99: Unsuccessful request for Bond
Bill funding to implement reconstruction plan
2000,2001: Bond Bill Committee directed Parks to
evaluate and investigate Public/Private partnership
Goal: State develop master plan, private
partner implement publicly accepted plan

2002 Site Plan
2002: Developed financing plan to utilize a
portion of the 21st Century Parks Endowment Fund for capital
investment
The Parks Endowment, with a
value of $15 Million was created from a federal court settlement requiring
the State of New York to pay the State of Delaware liquidated assets from
bankrupt New York-based companies that were incorporated in Delaware. Parks
benefit from the interest generated on the endowment investments.
Key point: Reconstruction funds did not come from State taxes
or the General Assembly but rather was borrowed from an existing endowment.
Financing Parameters: Borrow capital funds from
Endowment, repay loan (with interest it would have generated) within 20
years.
June 2002: General Assembly directed Parks to
implement State Plan
Safety Improvements 2003:
Implemented
safety improvements at marina while completing bidding documents for
reconstruction

Deteriorated deck
on floating docks

Aluminum plate
reinforced dock repair

Sinkholes caused by
fill material leaching through holes in bulkhead

New sidewalk:
separation from bulkhead prevents users from encountering sinkholes
Public meetings were held
throughout 2002 and 2003 to inform the public and accept input for final
design plans.
SLIPHOLDERS'
PRIMARY CONCERNS:
Repair/upgrade
floating docks
Dredge marina
basin
Upgrade
electric service on docks

This plan will be implemented/phased over a four-year period

Marina reconstruction contract
signing, September 2003: (from left to right)
Larry Kuhn, Kuhn Construction,
Governor Ruth Ann Minner,
DNREC Secretary John Hughes,
Parks Director Charles Salkin
Floating Docks
September 2003...

Docks being demolished

Reason docks are being removed

Basin with south side docks removed
Floating dock components being
delivered

Assembly of floating docks

Assembly is similar to jigsaw
puzzle

Icing of the marina basin
Work continues in the cold
Completed construction of floating
docks on southern half of basin

Existing floating docks on north
half of basin, to be replaced for 2005 season
Dredging...
Mid-September, dredging near
Burtons Island while waiting for removal of old docks

New Year's Eve
2003, dredging continues
Photo of outflow pipe from dredge
to confined disposal facility (spoils area)

After Phase I dredging is completed, dredge spoils dewater for months
Electric Upgrades...
Floating dock mounted substations
for electric on docks

Bracing against the cold, electric
gets installed
Electric cables are routed within dock structure

New distribution panels on shore
Boat Ramp...

Boat Ramp prior to Phase I construction

Demolished Ramp

Boat ramp under construction
Completed boat ramp (scheduled to open April 9, 2004;
actually opened April 1, 2004)
Bulkhead Replacement...

New steel sheet pile being placed
in front of old, deteriorated wooden bulkhead

New bulkhead will eliminate
sinkholes forming behind wall

Bulkhead being constructed

Heavy equipment necessary for this
work

Finished bulkhead
Marine Services Area...

Stone base for concrete slab
Incorporated in the marine service area is a
state-of-the-art oil/water separator to provide initial treatment of all
runoff from work areas prior to entering bio-filtration swales and stormwater settling ponds. This is one of many key components that will
assist in ensuring Indian River Inlet Marina will be the first marina in
the state to be certified as a CLEAN MARINA.
Travel Lift...

New 50-ton travel lift

Concrete piling going in to support travel lift piers

Forming and
reinforcing for travel lift piers

Finished travel lift piers (view from the water)

Completed travel lift piers (view from the land)
Paving...

Paving at new entrance

Paving near boat ramp

Finished product at boat ramp overflow parking area
Cottages...

Open PDF
(Updated April 4, 2003 - 415 KB)
Download FREE Adobe Acrobat Reader.

Foundations going in

'Million dollar view'

Cottages springing from the ground, first-class year-round overnight accommodations

View of cottages
from south side of inlet

Siding being installed

View from marina

Cottages 1 & 2 under construction

Cottage Complex

Cottages 5 & 6

Waterfront views

Cottage interior (view from loft)
Satellite TV and fireplace
Furnished kitchen
Relaxing inlet views from the porch
Successful Completion of Phase I Reconstruction, March
29, 2004
Provide slipholders new floating docks on south
half of basin
Provide 7 feet of water in south half of basin
at low tide
(as opposed
to 3 feet formerly in places)
Provide up to 100Amps of power at new 50 foot
slips
New docks south half of basin

Marine Services area

We even painted the ground green to
represent grass (actually, thats hydroseed and mulch)

Cottages

Fish cleaning building/commercial fishing berths

Starting to look more like a park every day

Looking north

Looking south

Goal
realized!
Future Plans for 2005
Replacement of floating docks
(north half of
basin)
Complete dredging (north half of basin)
Finish upgrade of electric
Reconstruct floating fueling facility (charters
will have in-slip fueling capability)
Construct dry stack boat storage facility ("Dry
stack" is similar to valet parking for a boat; slipholders
call ahead to have their boat placed in the water, fueled, and ready to go.
On return, the boat receives a fresh water rinse before being stored in the
dry stack storage building. Inside storage is convenient and protects the
investment by the boater, no UV light deterioration of fiberglass occurs and
there is no need to protect boat hull with potentially polluting bottom
paints.)

Open PDF
(275 KB)
Download FREE Adobe Acrobat Reader.

Photo of a similar dry stack building
at another marina

Inside of building showing storage rack system
Future Plans for 2006
Renovate Operations Building, including:
New restroom/showers for slipholders
Ships store
Upgraded administration facility

Open PDF
(269 KB)
Download FREE Adobe Acrobat Reader.
Future Plans for 2007
Renovate fish cleaning/sales building

Open PDF
(274 KB)
Download FREE Adobe Acrobat Reader.
DelDOTs
replacement of Indian River Inlet Bridge
and what
it means to the Park
Anticipated groundbreaking in October 2004

Bridge rendering (existing and proposed): DelDot project anticipated to be completed by
2008

Bridge rendering (view from outside inlet looking west)

Pedestrian pathways:
Safe access from north to south of inlet

Pedestrian pathways:
Interpretive experience highlighting ecology and celestial
navigation

Proposed North Side of Inlet Changes
(preliminary plan)
Due to
DelDOTs need to utilize the north side parking and camping areas during
construction, DelDOT, in cooperation with Parks, will replace these
amenities when the bridge is completed, estimated to be in 2008.
Improvements include:
Day-use
parking area
Two-point
hookup campground
New shower
and laundry buildings
New bathhouse
with outside showers for use by fisherman and surfers
Waterfront
promenade and trail extending to Burton's Island.
This
design has taken into consideration fishermens needs and provides them with
continuous access to the shoreline, as it is today, while providing a
separate path for walkers/bikers.
The Park
Office will be relocated adjacent to the historic Life Saving Station, one
and one-half miles north on Rt. 1. A small administrative facility/contact
station will be built in this area.
This plan
also provides new parking areas for the Center for the Inland Bays (CIB) and
an additional parking area for fishermen.

Proposed South Side of Inlet Changes
(preliminary plan)
Improvements on the south side include:
Relocation of
County Road 50a, so it no longer splits the campground in half
Improvements
to some camp sites impacted by the construction
Additional
parking at the SEDA Beach Bathhouse lot (due to loss of some parking on
north side)
An
informational kiosk will be constructed near the bathhouse explaining the
bridge project
DART bus stop
will be installed for use by the campers.
Note:
Campsites not shown are unaffected by proposed work.